Entire use has been made of all types of sophisticated strategies and technology to reach excelsior manufacturing. We have exported our products to Korea, Turkey, Bulgaria, Romania, Russia, Italy, Norway, the Usa, Canada, and so on. There is a technological heart of province degree, EPG academician doing work station, experiment station for EPG post medical professionals, and nationwide 863 plan established up in EPG team. With these platforms and robust technological ability, the much more than four hundred specialists have produced all selection of specific high precise and higher toughness goods, executed mould packages for key components in the auto and nationwide industry revitalizing program, resulting far more than 5000 created in excess of, amid which 33 items are autonomous patent engineering with 4 patent approved . EPT Designed EPT Responsibility Horizontal CNC Lathe
For Turning Metal Roller commaEPT Cylinder commaEPT Mildew commaWheel Hub Turbine commaFlange commaOil Pan commaShaft commaetc
1 interval OutstXiHu (West EPT) Dis.Hu (West EPT) Dis. Traits colon
one rpar period of time Have Load as EPT as Feasible colon Internationally forerunner computation technologies and optimized finite element investigation strategies are adopted and the chosen components are suitable for the design and style time period
2 time period rpar period of time EPT Rigidity comma Security and EPT Routine maintenance colon All castings are made of large-power meehanite EPTT250 period which is especially suited for weighty chopping period of time All huge castings stand the test of annealing and vibration aging and inside anxiety is eradicated comma so the all round precision is greatly improved and processed parts are discovered with higher geometric accuracy period
three period of time rpar One-piece construction made of meehanite comma drastically enhXiHu (West EPT) Dis.Hu (West EPT) Dis.ng its abrasion resistance comma and the inner pressure elimination method generates large vibration resistance and substantially improves steadiness interval The cross-formed foundation and rectangular bearing composition make sure higher structural security and forever steady quality interval
four interval rpar The lathe bed is in mounted hefty cutting structure comma incXiHu (West EPT) Dis.Hu (West EPT) Dis. rectangular hard rails examined by EPT warmth treatment and higher-precision floor grinding lparstraightness in complete stroke lt0 period05mm rpar time period
5 interval rparTurcite-B is pasted on the sliding surface in orEPTTto boost the rail aposs smoothness and putting on resistance interval The widened challenging rail design and style can provide necessary resistance and balance for large cutting period of time
six period rpar The headstock comma created of high strength and higher rigidity keel rib comma is in EPTT cage form comma and the EPTT incEPTTs course P5 grinding EPTs comma which can provide fascinating driving precision and higher torque time period
7 interval rpar Incorporating German AM technologies comma the main shaft is made of chrome-molybdenum alloy and proves high precision comma large rigid and appealing deformation resistance right after tough solfinish machining comma carbonization comma growing older remedy and precision grinding interval The motor figures large output lpar26kw rpar and the max period of time rev period of time is 3000RPM time period After the principal shaft assembling is finished comma the total assembly shall be calibrated by dynamic stability examination period of time The impartial lubrication will further increase the stability of the headstock throughout operation time period
eight period rpar StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd four knife library comma mounted on a turret utilised in precision turning time period
nine period rpar The tailstock is composed of two areas colon the upper one incEPTTs a sleeve moving mechanism comma spindle assembly comma and a shaft cEPTTrline adjustment system comma with a rectangular head in the rear comma which is developed to lock the sleeve manually semi and the lower one incEPTTs a tailstock fast-relocating motor and a locking system comma with the main shaft set up on the substantial-precision radial clearance-adjustable double-row cylindrical roller bearing in the sleeve comma rendering the large-precision rotating best on the tailstock interval Even so comma in orEPTTto fulfill certain EPTT specifications of the machining procedure comma it is feasible to transfer the plug board from the flange groove in the front of the sleeve to the groove in close proximity to the entrance end of the primary shaft in orEPTTto fix the principal shaft and get a EPT cEPTTr period of time
ten rpar The Major EPTT components are strictly inspected by the authority composition or the authoritative third get together to make certain the superb quality and higher precision time period
The subsequent image is the main portion that are inspected interval
A lot more than 50 a long time apos experience in EPTTry industry given that nineteen sixties time period
MaXiHu (West EPT) Dis.mize Consumer aposs Profitability unEPTTthe bare minimum invest EPT in comparison with other competitors period of time
Application colon This collection weighty responsibility horizontal lathe can uEPTTze high-pace steel and carbide cutting resources to complete rough or end turning approach for not only the non-ferrous metals like various structure steels comma casting steels and irons comma but also the exterior solinternal cylindrical sol conical sol spherical surfaces comma thread of non-metal components and all types of the area of curve rotary body period of time What aposs a lot more comma it can also understand the consistent velocity reducing line interval
two interval StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd EPTnical Parameters
Identify | CG61100 | CG61125 | CG61160 | CG61200 | CG61250 | CG61300 | |
Description | Device | ||||||
Max interval EPTg More than Bed | mm | 1000 | 1250 | 1600 | 2000 | 2500 | 3000 |
Max period of time EPTg Over the skateboard | mm | 650 | 800 | 1200 | 1650 | 1800 | 2800 |
Max time period WeigEPTT of Work-piece | T | ten | 15 | twenty | 20 | 20 | 40 |
Max period of time Duration of Operate-piece | mm | 3000-12000 | |||||
EPTs of Spindle Pace | sol | Infinitely Variable Pace solstep-less pace | |||||
Selection of Spindle Velocity | r solMin | ten-three hundred | 10-200 | 10-one hundred sixty | 4-eighty | 4-80 | one period6-63 |
Chuck Diameter | mm | 800 | 1000 | 1250 | 1600 | 2000 | 2500 |
X commaZ-AXiHu (West EPT) Dis.s Feed Variety | mm solMin | -3000 | |||||
Horizontal Stroke | mm | five hundred | 625 | 800 | one thousand | 1250 | one thousand |
EPTTitudinal Stroke | mm | 3000-12000 | |||||
Principal Driving EPT | Kw | 11 | 22 | 45 | 75 | seventy five | seventy five |
Slicing Force lparCarriage rpar | Kn | 4 | 6 | twenty | forty | 40 | 60 |
Sleeve Diameter of EPTTilstock | mm | one hundred eighty | 180 | 290 | 290 | 290 | 480 |
Spindle Diameter of tailstock | mm | 125 | one hundred twenty five | one hundred sixty | one hundred sixty | 160 | 240 |
three period of time Following-sale Provider amp Upkeep
1 period We offer specialist technical coaching for customers apos operators and routine maintenance personnel to enable them to properly use and function the lathe and carry out regular maintenance interval
2 period of time Warranty time period colon A single yr right after acceptance of the lathe period
3 time period In situation of any high quality issue identified during procedure comma the manufacturing facility will dispatch personnel to the person aposs spot in forty eight several hours lpardomestic users rpar amp within 3 daEPTT lparEPT Consumer rpar and the specialized personnel received apost go away just before resolving the malfuntion period
four period of time The organization will freely supply distinct EPT and mechanical elements for the obtained lathe timely inside of guarantee period of time time period
five period of time The company will provide life time guarantee for the consulting solutions in phrases of software comma maintenance comma repair comma renovation comma etc of equipments interval
For far more particulars comma please really feel free to make contact with us period Many thanks excl