we have received the have confidence in of customers around the world. Support & Good quality controlWe source comprehensive drawings and offer you every time required. Meanwhile, our products are made according to substantial top quality specifications, and complying with the international sophisticated regular requirements.
Big EPT Obligation Handbook or CNC EPT Horizontal Lathe EPTT
For Turning Roller commaCylinders comma EPTT Shaft commaEPT Mould comma Railway Areas commaWheel Hub Turbine commaFlange commaetc
1 time period OutstXiHu (West EPT) Dis.Hu (West EPT) Dis. Qualities colon
1 rpar interval Have Load as EPT as Possible colon Internationally forerunner computation systems and optimized finite factor investigation techniques are adopted and the selected resources are appropriate for the design and style time period
2 period rpar interval EPT Rigidity comma Steadiness and EPT Servicing colon All castings are manufactured of higher-energy meehanite EPTT250 period which is particularly ideal for large slicing time period All massive castings stand the examination of annealing and vibration ageing and internal tension is removed comma so the general precision is tremendously increased and processed parts are found with high geometric accuracy time period
three time period rpar One particular-piece structure created of meehanite comma drastically enhXiHu (West EPT) Dis.Hu (West EPT) Dis.ng its abrasion resistance comma and the inside power elimination procedure generates substantial vibration resistance and considerably enhances security time period The cross-formed foundation and rectangular bearing composition make sure higher structural security and forever steady high quality time period
four time period rpar The lathe bed is in fastened hefty slicing framework comma incXiHu (West EPT) Dis.Hu (West EPT) Dis. rectangular tough rails examined by EPT heat treatment and high-precision area grinding lparstraightness in complete stroke lt0 period05mm rpar time period
5 period of time rparTurcite-B is pasted on the sliding floor in orEPTTto increase the rail aposs smoothness and sporting resistance time period The widened hard rail style can give needed resistance and security for hefty chopping period of time
six period of time rpar The headstock comma produced of substantial strength and large rigidity keel rib comma is in EPTT cage shape comma and the EPTT incEPTTs class P5 grinding EPTs comma which can give appealing driving precision and greater torque time period
7 interval rpar Incorporating German AM technologies comma the primary shaft is created of chrome-molybdenum alloy and proves large precision comma large rigid and attractive deformation resistance soon after tough solfinish machining comma carbonization comma aging treatment and precision grinding period The motor figures high output lpar26kw rpar and the max period rev period is 3000RPM interval Following the main shaft assembling is finished comma the whole assembly shall be calibrated by dynamic stability examination period of time The independent lubrication will even more improve the security of the headstock during operation period
eight period rpar StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd four knife library comma mounted on a turret used in precision turning period of time
9 period of time rpar The tailstock is made up of two parts colon the higher a single incEPTTs a sleeve transferring system comma spindle assembly comma and a shaft cEPTTrline adjustment system comma with a rectangular head in the rear comma which is made to lock the sleeve manually semi and the lower a single incEPTTs a tailstock fast-moving motor and a locking system comma with the primary shaft mounted on the substantial-precision radial clearance-adjustable double-row cylindrical roller bearing in the sleeve comma rendering the high-precision rotating prime on the tailstock time period Nevertheless comma in orEPTTto fulfill specified EPTT demands of the machining method comma it is possible to transfer the plug board from the flange groove in the entrance of the sleeve to the groove in close proximity to the entrance stop of the primary shaft in orEPTTto correct the principal shaft and acquire a EPT cEPTTr period of time
ten rpar The main components are inspected strictly by the Inspecting Authority to guarantee an exceptional high quality interval
The pursuing picture is the main EPTT elements inspected by the 3rd Social gathering Inspection period
Our Theory colon MaXiHu (West EPT) Dis.mize Customer aposs Profitability unEPTTthe minimal commit EPT period
Application colon This sequence CNC horizontal lathe can uEPTTze substantial-pace metal and carbide cutting instruments to end tough or end turning method for not only the non-ferrous metals like various framework steels comma casting steels and irons comma but also the exterior solinternal cylindrical sol conical sol spherical surfaces comma thread of non-steel materials and all sorts of the surface of curve rotary body period What aposs much more comma it can also recognize the continual velocity reducing line interval
two time period EPTnical Parameters
Name | CG61100 | CG61125 | CG61160 | CG61200 | CG61250 | CG61300 | |
Description | Unit | ||||||
Max period of time EPTg In excess of Bed | mm | a thousand | 1250 | 1600 | 2000 | 2500 | 3000 |
Max period EPTg Above the skateboard | mm | 650 | 800 | 1200 | 1650 | 1800 | 2800 |
Max time period WeigEPTT of Operate-piece | T | ten | 15 | 20 | 20 | 20 | 40 |
Max period Length of Work-piece | mm | 3000-12000 | |||||
EPTs of Spindle Pace | sol | Infinitely Variable Pace solstep-considerably less pace | |||||
Variety of Spindle Speed | r solMin | 10-300 | 10-200 | ten-a hundred and sixty | four-80 | 4-eighty | one period6-63 |
Chuck Diameter | mm | 800 | a thousand | 1250 | 1600 | 2000 | 2500 |
X commaZ-AXiHu (West EPT) Dis.s Feed Variety | mm solMin | -3000 | |||||
Horizontal Stroke | mm | 500 | 625 | 800 | 1000 | 1250 | a thousand |
EPTTitudinal Stroke | mm | 3000-12000 | |||||
Principal Driving EPT | Kw | eleven | 22 | 45 | seventy five | 75 | 75 |
Cutting Pressure lparCarriage rpar | Kn | 4 | six | 20 | 40 | forty | 60 |
Sleeve Diameter of EPTTilstock | mm | a hundred and eighty | a hundred and eighty | 290 | 290 | 290 | 480 |
Spindle Diameter of tailstock | mm | 125 | 125 | one hundred sixty | one hundred sixty | one hundred sixty | 240 |
Rermarks colon
one time period The above six models of EPT Duty Horizontal Lathe EPTT are the stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd configurations comma we can also style and manufacture EPT lathe EPTTs in accordance to the consumer aposs workpiece characteristics time period It can be guide or CNC control comma the two are accessible interval
2 time period This collection hefty obligation horizontal Lathe has been exported to Norway comma TEPTTd comma Romania comma Iran comma Russia comma Chile for machining railway parts comma vehicle parts comma mining and metallurgy comma transport creating comma wind EPTT and other EPTTry market period
3 period of time Deal and Shipment
Anti-Rust Oil sol Anti-Corrosive Oil for the EPTT EPTT comma then wrapping the protecting film
EPTen Box Deal comma or vacumm deal is also obtainable in accordance to buyer aposs EPTT request period
four time period Soon after-sale Provider amp Routine maintenance
one interval We provide professional technological education for end users apos operators and upkeep employees to permit them to properly use and run the lathe and carry out standard upkeep time period
2 period of time Guarantee period colon One 12 months following acceptance of the lathe period
three period In case of any high quality problem found throughout procedure comma the factory will dispatch personnel to the person aposs area within 48 several hours lpardomestic users rpar amp inside three daEPTT lparEPT Customer rpar and the complex personnel gained apost go away prior to resolving the malfuntion time period
four time period The company will freely supply different EPT and mechanical components for the acquired lathe well timed in guarantee period of time interval
five period of time The organization will provide lifetime guarantee for the consulting companies in phrases of software comma servicing comma mend comma renovation comma and so on of equipments interval
For more specifics comma make sure you truly feel cost-free to contact us period Thanks excl