we are self-assured to supply our buyers adaptable and diversified services. In 2008, it was awarded with “Countrywide Export Commodity Inspection-free Organization”. With many years’ experience in these traces, we have been distinguished from other suppliers in China by our positive aspects in aggressive pricing, on-time delivery, prompt responses, on-hand engineering support and excellent following-revenue services. Remember to be aware: Some merchants duplicate our merchandise texts, only the HengEPTT brand has German EPT and patent certificates.
hose crimping EPTT | ||||
Design | DX68 | DX76 | DX102 | DX150 |
Crimping variety | 6-51mm(1/four quot ~2 quot) | six~76mm ( 1/four~three quot ) | six~102mm ( 1/4~four quot ) | six-150mm(1/four~six quot) |
Max crimping Power | 449T | 500T | 1400T | 2500T |
Rated Force | 31.5MPa | 50Mpa | 31.5Mpa | 31.5Mpa |
Bodyweight | 250kg | 300kg | 520kg | 900kg |
Mildew EPTtity | 10 sets | 13Sets | 16Sets | 17Sets |
EPTT | 3KW/4KW | 4KW | 4KW/5.5KW/7.5KW | 4KW/five.5KW/7.5KW |
Voltage | 220V/380V | 240V / 380V | 380V or EPT | 380V or EPT |
Scale accuracy | .02mm | .02mm | .01mm | .01mm |
All round proportions | 670*490*780mm | 730*470*930mm | 900*790*1070mm | 1030*630* 1160mm |
Brief Introduction
Model DX68 pipe locking EPTT is mainly utilized for buckling processing for large pressure rubber pipe assembly in the mechanical engineering. It can also be utilised for buckling the two-way bends, eEPTTly large bends and irregular shape bends.
This EPTT characteristics modest and transportable visual appeal, massive pressure, minimal sound and straightforward to oper- ate. The buckling volume can be exact altered through a scale. It tends to make the mould base division to be more even through the double inclined airplane eight-flap mould seat equipped with a substantial accuracy XiHu (West EPT) Dis.Hu (West EPT) Dis. unit.
Major EPTnical Characteristic
Buckling variety: Phi4mm- Phi51mm(2 levels metal wire rubber hose) Max. buckling force: 449T
Scale accuracy: .02mm Rated pressure: 31.five MPa
Oil pump displacement: 5ml/rad (380V) two.5ml/rad (220V) All round proportions: 670(L) times490(W) times780(H)mm
Set up and Operation
one.Add sufficiently seventy nine liters of Great Wall model forty six# anti-abrasion EPT oil. If the room tem- perature is reduce than 10 ordmC, 10% transformer oil is need to have to insert.
Join the electric powered supply nicely as for each the EPTT demands, to make the course of the motor rotation to be regular with the rotation direction marking, and grounding protection shall be carried out.
2.Regulating the scale
The scale is employed for regulating the volume of the buckling. When it is regulated clockwise, the buckling quantity will lower, when it is controlled anticlockwise, the buckling volume will increase. The scale is linked together with oil cylinEPTTend cover by means of 3 socket head screws and three EPTs on the scale base. When employing a hand to pull the scale (vertical to the oil cylinEPTTend go over route), the scale can fleXiHu (West EPT) Dis.bly depart from the oil cylinEPTTend cover. When releasing the scale, the scale will be recovered relying on EPT drive. Before the EPTT is turned on, inspect carefully if the scale telescoping is fleXiHu (West EPT) Dis.ble and if the direct con- nection is dependable.
three.The major scale is turned inside line of the secondary scale, change the EPTT on for examination operate, and notice if all steps are normal. If when the piston conducts reciprocating shift- ment, there is a crawling phenomenon, the bleed screw on the oil cylinEPTTtop shall be unscrewed for exhausting air.
4.Pressure regulation
The buckling force and opening mould pressure will be controlled via two knobs at the again of the oil cylinEPTT(see determine), when it is controlled clockwise, the stress will boost, when it is regulated anticlockwise, the force will lower (The stress has already been nicely controlled when ex-factory).
five.Operation
Based on the size of the rubber hose to be buckled, decide on suited mould as for every the complex parameter reference desk of the locking pipe and mount it on the mould base. Regulated nicely the scale place as for every the info in the info in the table, the pipe locking can be done. Right after pipe locking, use a vernier caliper to mease the outside diameter dimension of the pipe sleeve soon after buckling to see if it meets the reference table information of the parameter. If it does not meet the info, the scale shall be precisely regulated till it meets the specifications. Due to the fact the manufactures of the pipe sleeve are various, so, particular dimension, substance, hardness etc are definitely not the very same. These variables would end result distinct influences on the pipe locking end result, consequently, the knowledge in the desk is only for reference, the in depth knowledge get the pressure check as the basis.
Notices
1.When buckling, make the joint to find the mould cEPTTr as considerably as achievable, the joint is not buckled on the hex nut.
2.Prevent instrument and other international matter from EPTTring the locking head.
three.Following the perform is completed for each and every time, the 8-block mould base must be produced to increase to the biggest extent, this can make the EPT to be at extension position. If not, the EPT will be injury.
four.When functioning, the hand should not stretch into the locking head.
5.The EPTT source must be switched off when routine maintenance is accomplished.
Upkeep and Treatment
Servicing
The EPT oil in the oil tank ought to be usually checked, if oil sum is found to be insuf- ficient, the oil shall be timely supplemEPTTd. If the oil liquid is polluted, it shall be filtered or changed.
The locking head shall keep internal cleanliness. Keep away from the international issues in the course of processing to EPTTr into the locking head oil cylinEPTTvia the mould to impact the normal use. Wipe out the international matters, which are brougEPTT by the mould human body in time when buckling the joint.
Regularly fill suited grease into the mould physique for lubrication.
Guarantee
We will provide a ensure to preserve the EPTT in very good fix in twelve months from the working day when the EPTT is acquired. All fitting difficulties will be totally free of charge fixed (or changed if required) during the guarantee period of time. The injury resulted from improper use o accident damage does not beEPTT to totally free of charge repair range.
The EPTT List
1.The large strain locking tube EPTT in design DX sixty eight one set
two.Mold (Complete 10 Sets) Phi6 1 established
Phi10 1 established
Phi13 1 set
Phi16 1 established
Phi19 1 established
Phi22 one set
Phi25 one established
Phi32 one established
Phi38 1set
Phi51 1set
FAQ:
1. What level of service do you provide ?
*Your inquiry will be replied in 24 several hours.
*EigEPTT continuous years as an Alibaba EPT supplier and a lot more than 25 years EPTT EPT and manufacturing expertise .
* We supply cost-free spare parts and service within fourteen thirty day period warranty time period.
* EPTT Help by providing operation instruction movies .
* Specialist after-revenue provider staff.
* Give sensible provides with the very best high quality.
two. What is our advantages?
* Competitive value: We can meet your budget and best-promoting business quite properly.
* OEM Recognized: We can create EPT design.
* Very good Support: We take care of clients as friends and provide dilemma solving at any time you want.
* Excellent EPTT: We have rigid quality management program. Very good popularity in the marketplace.
* Quickly amp Delivery: We have massive price reduction from forwarEPTT(EPTT-term Deal).
* Doorway To Door Service.
three. Can you customise the EPTT for the buyer?
Sure. We can, we also provide OEM for consumers If you want EPT solutions, please speak to us
4. What is the MOQ?
We usually provide 1 established for consumers to take a look at.
Troubleshooting
Difficulties phenomena | Difficulty purpose | Removing strategy |
EPTT has not motion | Oil tank has not been filled with oil | Fill oil as for each prerequisite |
EPT rotation route is not right | Regulate two period strains | |
Electric powered difficulty | Overhaul electrical circuits | |
Scale is ruined | The scale is fixed on the oil cylinEPTTend experience by the screw | Control the scale as for each the instruction to make scale to telescope freely |
Conductor at scale place is linked with scale | Anew join the scale conductor to make it to be insulated from scale base | |
Electrical problems | Overhaul electric circuits and electric factors | |
Scale conductor slicing | Anew connect scale | |
Technique force is excessively low | Modify buckling pressure-regulating valve | |
No buckling | The valve main of solenoid reversal valve is seizured by overseas matters | Dismount solenoid reversal valve, use gasoline to cleanse the valve core. |
Electric difficulties | Overhaul electric powered circuits | |
EPT is not opened | Opening mould stress is excessively minimal | Adjust opening mould strain regulating valve |
Electric powered trouble | Overhaul electric circuits | |
Big sounds | Installation is not steady | Perform horizontal secure installation |
EPT oil is excessively dirty | EPT or alter it | |
EPT is blocked | Use gasoline to cleanse the filter | |
EPT foundation crawls | Gas in the EPT oil has not bee exhausted completely | Ideal unscrew the bleed screw, make the piston in the oil cylinEPTTto move back again to previous position to exhaust gas, then screw down bleed screw. |
Lubrication is bad | Smear grease on the doing work inclined face of mould base | |
Oil leakage | EPTt is not tightened intently | Tighten the oil pipe joint |
EPT washer is damaged. |
A parameter list of the tooting and the push drive for each sort of rubble tube(for reference)
order | Inner diameter of the rubble tube | Outer diameter of the rubble tube |
Employed tooting | Half locking amp pressing meter pressure MPa | EPTT locking amp urgent meter strain MPa | |
1 | Phi6 | Phi15 Phi17 | Phi15 | five.5 6 |
six~8 9~eleven |
|
two | Phi10 | Phi19 Phi21 | Phi21 | 6.five~seven seven.5~eight |
10~eleven 13~16 |
|
3 | Phi13 | Phi23 Phi25 Phi27 | Phi25 | eight.5~nine ten~eleven |
fourteen~17 fifteen~eighteen |
|
4 | Phi16 | Phi26 Phi28 | Phi28 | nine~ten ten~11 |
15~eighteen 18~22 |
|
five | Phi19 | Phi29 Phi31 Phi35 | Phi30 | nine eleven~12 22~24 |
15~seventeen 20~22 29~31 |
|
six | Phi22 | Phi32 Phi34 Phi38 | Phi34 | 12~13 fourteen~16 20~25 |
seventeen~19 19~21 25~thirty |
|
7 | Phi25 | Phi36 Phi38 Phi42 | Phi38 | ten~eleven fifteen~sixteen 26~28 |
16~eighteen 20~24 28~32 |
|
eight | Phi32 | Phi44 Phi46 Phi50 | Phi42 Phi45 | twelve~thirteen sixteen~eighteen 32 |
18~22 30~34 32~38 |
|
nine | Phi38 | Phi50 Phi52 Phi60 | Phi50 Phi55 | fourteen twenty 26~thirty |
22~26 28~32 44~forty eight |
|
10 | Phi51 | Phi63 Phi65 Phi69 | Phi60 Phi65 | twenty five thirty 35 |
26~28 40 48 |
If any confusion, pls contact:
Hana (EPT Manager)
Mob./ 18522425988
Tel: 86~571-8822571/88220973-83859655
Is there any other kind EPTT I can choose?
We provide numerous kinds of hose crimping EPTT. If you are interested in any one, Any concerns are welcome.